About 杰 周
Education
-
2003
土木工程专业
兰州交通大学
Experience
-
2023 - 2026
Zhengzhou Xinyi Municipal Engineering Co., Ltd
Project Manager
Managed the desulphurization supporting piling project of Nanyang Power Plant Phase II. Responsible for bored pile, CFA pile construction, pile head cutting and full-cycle site management including quality, safety, progress and settlement control.
-
2019 - 2023
CSCEC 7 Real Estate Zhengzhou Branch
Deputy Chief Engineer
Responsible for technical management and engineering department operation of 266,000 ㎡ large-scale commercial & residential complex. In charge of drawing review, construction scheme approval, foundation & superstructure technical control and on-site problem solving.
-
2008 - 2019
Inner Mongolia Yellow River Engineering Bureau Beijing Branch
|Project Manager
Overall full-cycle management for UHV power transmission, hydropower, expressway, deep-water port and land reclamation EPC projects. Fully responsible for project schedule, cost control, quality & safety management, subcontractor coordination, variation order, claim settlement and project final handover. Accumulated 11 years of rich overseas construction experience in Southeast Asia. Domestic Projects:Hubei Chibi & Anhui Huainan 800kV UHV River Crossing Foundation Works, Yunnan Lijiang Liyuan Hydropower Station (2500mm large-diameter anti-slide bored pile). Overseas Projects:Vietnam Hanoi-Haiphong Expressway Stage 8 & 9 Piling Works, Sri Lanka Broadlands Hydropower Project (4.9km tunnel system construction management), Sri Lanka Southern Expressway Extension, Malaysia Kuantan Deep Water Port vibro-compaction works, Sri Lanka Colombo Port City land reclamation & dynamic compaction ground improvement.
-
2003 - 2008
Beijing Vibroflotation Engineering Co., Ltd.
Technician / Project Engineer / Chief Engineer / Deputy Project Manager
Responsible for full-process foundation construction management for municipal, power plant, port and industrial projects. In charge of technical submission, construction disclosure, quality & safety control, dewatering, shoring, earthwork and concealed work acceptance. Handled various piling and soft ground improvement works. Key Projects:Hangzhou Qige Sewage Treatment Plant Phase II, Deqing High-rise Residential Piling Project, Zhejiang Lanxi Power Plant Phase II, Fujian Quangang Refinery Piling Works, Huizhou Wind Power Foundation, Shanghai Majishan Port, Tangshan Caofeidian Crude Oil Terminal & Artificial Island, China Resources Power Plant, Harbin Refinery Oil Tank Foundation. Key Works:Stone column, driven cast-in-situ pile, bored pile, deep mixing column, vibro-compaction, foundation dewatering, excavation shoring and infrastructure construction.
Honors & awards
-
2021年
项目管理标兵
属于集团级别的奖项。在管理一个住宅楼盘项目时获得